Home

Visit CIRIA

Visit NERC
 

Environmental Risks to Infrastructure Innovation Programme

Quantifying the risks of tree failure to guide proactive management and increase the resilience of electricity distribution networks

CIRIA Ref:

NERC Ref:

Start Date:

16

NE/M008614/1

31/10/2014

Case Study:

Call Year:

End Date:

Open PDF

2014

30/10/2015

Research Institution:

Lancaster University

Principle Investigator:

Dr George Blackburn

CO Investigator(s):

Industry Partners:

Scottish Power Energy Networks

Hazards

Other

The aim of the project was to develop scientifically based, robust and objective method to predict tree failure in severe weather conditions. Tree failure can cause significant damage to electricity supply networks. It is possible to reduce the impacts on electricity networks by felling trees that are close to power lines and at more risk of failure in severe weather conditions. This project allows a replicable and objective risk assessment of trees that are close to a power supply network, resulting in a risk value assigned to each individual tree.

Further Information

No additional information availible.

 

Copyright © 2018 Ciria.